terminal «ZAPORIZHZHIA»

Terminal capabilities

1400

TEU place
at the same time

150

overload containers
per day

60 000

м2 area
of terminal

1000

м2 indoor and
outdoor warehouses

container terminal «ZAPORIZHZHIA»

This is 6 hectares of effective area with access ways, a cargo customs complex, warehouses, a special area for refrigerated containers, technical equipment with a carrying capacity of up to 45 tons, and warehouses for receiving and unloading general and bulk cargo.

Reachstackers, forklift loaders, RTG crane in combination with a professional team load over 100 containers every day, providing quality and uninterrupted service.

Direct railway connection

The terminal is located in one of the largest administrative and industrial centers of Ukraine, where it expands its logistics capabilities and allows to delivery cargo ”to the door” the final recipient. This is facilitated by an important transit railway hub, through which a regular container train runs connecting the terminal with the ports of

The network of highways of international importance
(M18, M14 and M04)

CONTAINER TERMINAL ODESSA

BROOKLYN-KIEV
PORT

CHERNOMORSK FISHING
PORT

  • Наши менеджеры спланируют логистическую схему заранее, а, при необходимости, - смогут оперативно включить доставку вашего груза по графику регулярного сообщения, предложив также собственный подвижной состав.

shedule of container trains

time of departure

way time

time of arrivAL

19:34

zaporizhzhia-vantazhne

23:15

18:49

odesa-port

19:06

odesa-port

24:42

19:48

zaporizhzhia-vantazhne

19:34

zaporizhzhia-vantazhne

22:26

18:00

ChORNOMORSKA (for tis)

21:20

ChORNOMORSKA (for tis)

22:28

19:48

zaporizhzhia-vantazhne

19:05

PAROMNA (RybNYI PORT)

24:43

19:48

zaporizhzhia-vantazhne

19:34

zaporizhzhia-vantazhne

25:45

21:19

PAROMNA (RybNYI PORT)

SPECIFICATIONS OF 6 HECTARES
OF EFFECTIVE AREA

The railway front of the processing of wagons and platforms with access ways allows the simultaneous supply of an entire container train from 44-45 platforms for processing.

Cargo customs complex, which concludes of: an office space, an inspection warehouse for simultaneous showing of four containers for inspection.

Refrigerated platform with one-time placement of 30x40'RF with the possibility of increasing the capacity at the next stage of development to 40-50 x 40'RF

Open universal storage areas for receiving and shipment of general and bulk cargo.

Container area, on which can simultaneously set 1200 - 1400 TEU

Indoor (S = 450m²) and open customs warehouses (S = 500m²)

Commercial scales, with a lifting capacity of 80.0 tons

HANDLING EQUIPMENT AND TECHNOLOGY

Rtg crane production "konecranes", loading capacity of 40.6 tons

Two units of heavy container loaders reachstacker “konecranes”, loading capacity of 45.0 tones

Forklift loaders, loading capacity of 12,0-16,0 tones

Live 1